Track Record

BBP's proprietary technology is applicable to any Central Cooling Plants, across the spectrum of large scale commercial and industrial real estate

We have helped our clients achieve up to 30% energy savings

We were rewarded to implement BBP Optimisation system at Philips LumiLEDs factory in Singapore.  This resulted in 27% energy savings.

Instead of replacing the 14 year-old chiller plant, LumiLEDs assigned BBP to optimize the existing system with the goal of achieving lower energy consumption. BBP system is helped LumiLEDs’ central chiller plant achieve  an efficiency of 0.64 kW/RT by improving its performance with 27% . This led to LumiLEDs saving over S$700,000 in annual energy costs. The project also resulted in LumiLED’s winning the BCA Green Mark Platinum Award in 2015 where BBP acted as ESD consultant.

Read more

Dairy Farm chose BBP solution to reduce energy consumption in their Giant Tampines store. The implementation of BBP solution led to achieved annual savings of over S$150,000.

Read more

.

Resort World Sentosa used BBP solution to optimize the operation of its District Cooling Plant (DCP). Despite the relative young age of the DCP plant, BBP system could achieve reduced energy consumption – a fact that was featured in Channel News Asia Money Mind program.

Watch the video
globalfoundries

Globalfoundries is a leading full-service semiconductor design, development, fabrication and innovation company. Globalfoundreis has approximately 18,000 employees across 14 locations across the globe. Globalfoundries has chosen BBP to improve the energy efficiency of one its largest fabs in Singapore.

HSBC is currently leasing the premises for its Head Quarter in Singapore. BBP worked with HSBC as tenant, as well as Jones Long Lasalle (The appointed facilities Management Company) and Capita Commercial Trust (the landlord) to offer its optimization solution without any cost to either party.

Shangri-La group chose BBP solution to improve the operation of Air Conditioning system at the Rasa Sentosa Resort & Spa. By improving the operation of existing Air Conditioning equipment, BBP helped the group reduce its operating cost and mitigate parts of its environmental impact.

Tolaram Group assigned BBP to achieve energy savings at Tolaram Building in International Business Park (IBP). After seeing the depth of data generated by BBP system and insights it could bring to operation and maintenance, Tolaram chose BBP’s Value Added Maintenance service  to oversee maintenance of its existing HVAC equipment.

Komoco Holdings installed its system at show room and office building in Alexandra road in order to optimise its water cooled packaged unit system. Besides achieving energy savings, the data gathered by BBP system helps in day to day operation and maintenance by facilitating fault detection and repair work.

Changi Airport Group chose BBP system to improve the energy consumption of its Cargo Agent Building C (CAB C) in order to reach the groups Green Mark Goals.

Besides Air Conditioning, BBP system can reduce the energy consumption of refrigeration systems. Singapore Airport Terminal Services (SATS) is working together with BBP to reduce energy consumption in cold rooms and freezers.

Hewlett Packard (HP) Singapore chose BBP solution to reduce the energy consumption and environmental impact of its production facility in Singapore.

Narai Hotel Located in Bangkok, Narai Hotel has been in operation for over 4 decades. Despite already following the Green Leaf Environmental Standard, it chose BBP proven energy-saving solutions to achieve even greater energy efficiency for its system.

Mall Artha Gading (MAG) One of the prominent malls situated in North Jakarta, MAG management has engaged BBP services to help optimise its energy consumption to reduce the environmental impact of the building.

2016 Frost & Sullivan Singapore Energy Management Solutions Entrepreneurial Company of The Year

PLATINUM

Green Mark Award for Buildings

Lumileds Singapore

Existing Non-Residential Building

Building Owner: Philips Singapore Pte Ltd
Facility Management: Philips Singapore Pte Ltd
ESD/Green Consultant: Barghest Building Performance Pte Ltd

Estimated energy savings: 3,510,562 kWh/yr; Estimated water savings: 290,026 m³/yr

Targeted chiller plant system efficiency of 0.641 kW/ton

LED lights installed in production plant and office space achieved 40% improvement in Lighting Power budget compared to code.

Introduction of Water Recycling Plant (recycling of AHU Condensate Water, Production Waste water & RO Reject water) resulted in water savings of 290,026 m³/yr.

Smart meters are installed to capture the daily water consumption and linked to BMS as well as to PUB for monitoring purposes.

Recycling facilities are available to collect, monitor and control flow of various recyclable materials.

Green guide and various awareness programs are conducted through EHS website, Training courses and notifications.

See also: BBP Featured in The Singapore Engineer Magazine

Our Team

Contact