Energy Audit

Our engineers simulate the impact of BBP’s algorithm on a potential client’s existing system, calculating the magnitude of energy potential savings

Energy Audit

Next, our engineers visit your plant to carry out a detailed assessment of your HVAC equipment’s performance. To gather accurate data, our engineers install sensors and monitoring equipment to capture various technical and operational data points. There is no disruption to plant operations at any time.

Free Energy Audit Report

At the end of the audit period, all sensors are removed. Using data analytics technology, our engineers use the data collected during the audit period to simulate your plant’s energy consumption when BBP’s solution is employed.

We then prepare a comprehensive Energy Audit report that offers a glimpse into the energy savings you can obtain by using our solution.

This report is provided free of charge and no commitment is required at this stage.

Existing Proposed Savings %
Cooling load RT 4,369.7 4,369.7 0.0 0.0%
Chiller KW KW 2,314.9 2,226.5 88.4 3.8%
PCHWP KW KW 180.3 91.6 88.7 49.2%
SCHWP KW KW 319.0 171.6 147.4 46.2%
CWP KW KW 256.0 166.7 89.3 34.9%
CT KW KW 156.1 131.1 25.0 16.0%
Total KW KW 3,226.3 2,787.5 438.8 13.6%
CH KW/RT KW/RT 0.530 0.510 0.020 3.8%
PCHWP KW/RT 0.041 0.021 0.020 49.2%
SCHWP KW/RT 0.073 0.039 0.034 46.2%
CWP KW/RT 0.059 0.038 0.020 34.9%
CT KW/RT 0.036 0.030 0.006 16.0%
Total Plant KW/RT KW/RT 0.738 0.638 0.100 13.6%
Average Cooling Load (TH) TH 38,278,176 38,278,176 0 0.0%
Chiller Energy/Year KWH 20,278,297 19,504,240 774,056 3.8%
PCHWP Energy/Year KWH 1,579,468 802,291 777,177 49.2%
SCHWP Energy/Year KWH 2,794,853 1,503,617 1,291,236 46.2%
CWP Energy/Year KWH 2,242,675 1,460,315 782,360 34.9%
CT Energy/Year KWH 1,367,173 1,148,345 218,828 16.0%
Total Energy/Year KWH 28,262,466 24,418,808 3,843,657 13.6%
Total Energy Cost (S$/Year)* $ $4,804,619 $4,151,197 $653,422 13.6%
Maximum Demand (S$/Year)* $267,138 $230,808 $36,330 13.6%
Total (KWH +MD) $ $5,071,758 $4,382,005 $689,752 13.6%

About the Energy Audit Report

The first column is our measurement of your plant’s current energy requirements and costs.

In the second column are the simulated energy requirements and costs after BBP’s energy efficiency solution is employed.

The last two columns show the resulting savings in energy costs.

See something interesting ?