We revolutionise
energy efficiency

to save cost & planet
Partnering businesses to reduce energy consumption by up to 40% with minimal cost investment.
bbp’s patented and award-winning HVAC optimization technologies reduces energy consumption for chiller equipment and facilities.
0 million
kg CO2e avoided
0 million
kWh saved
US$ 0 million
savings achieved
0 markets
covered

Client Success Case Studies

Hewlett Packard

HP Singapore chose bbp to reduce the energy consumption and environmental impact of its Alexandra and Tuas production facilities in Singapore that runs 24/7.

Lumileds

Instead of replacing a 14 year-old centralized chiller plant, Lumileds assigned bbp to optimize the existing system with the goal of achieving lower energy consumption.

Resorts World Sentosa

RWS engaged bbp to optimise the operation of its District Cooling Plant (DCP). Despite having gone through one round of energy optimization primarily via equipment upgrade, bbp’s patented software algorithm further reduced RWS's energy consumption.

Reduce your energy consumption with minimal cost investment.
Get in touch with your local bbp team.